Import payments
Import payment schedule calculator
A common plan is a 30% deposit on order confirmation and 70% before shipment or against a copy of the B/L. Enter the amount and dates to see what falls due at each milestone.
Schedule
Payment 1 · 30% · Order confirmation
$0.00
Date needed
Payment 2 · 70% · Before shipment
$0.00
Date needed
Fictional example: a USD 20,000 order on 30/70
The order is confirmed on March 1: a USD 6,000 deposit falls due.
The goods are ready on April 15: the remaining USD 14,000 is due before they ship. If the balance were against a B/L copy, the B/L date would drive it.
Common mistakes
- Paying the balance without inspecting the goods or checking the agreed documents.
- Switching bank accounts on an emailed notice without confirming it through a channel you already trust.
- Planning around a single shipping date, with no buffer for delays or Chinese New Year closures.
- Leaving the percentage, milestone and days of each payment out of the proforma.
Frequently Asked Questions
Quick answers to common questions about this topic
A bank transfer in two parts: 30% as a deposit to start production and 70% as the balance, before shipment or against a B/L copy as agreed.
Before shipment you pay while the goods are still at origin. Against a B/L copy you pay once there is evidence they have been shipped.
A bank’s payment undertaking, honored when the seller presents the documents the credit requires and they comply with its terms.
No. Calculation and export happen in your browser and the draft stays on your device.
Checklist before you pay
- The proforma states percentage, milestone, days and currency for each payment.
- The beneficiary name matches the company on the proforma and contract.
- You confirmed the bank account through a second channel you already knew.
- Before the deposit: specifications, sample and delivery date approved in writing.
- Before the balance: inspection done and result reviewed.
- Before the balance: agreed documents checked (invoice, packing list and B/L if applicable).
- Any change of account is put on hold until confirmed through a known channel.
- You kept proof of every payment.
Related guides
More tools
- CBM and container calculatorCubic meters, weight and loading for 20ft, 40ft and 40HC containers.
- Boxes per containerCartons in a 20ft, 40ft or 40HC, with dimensions and max payload.
- Incoterms 2020 selector and comparisonAnswer a few questions and compare who pays each charge and where risk passes.
- FCL or LCL? Break-even pointCompare consolidated and full container with your rates.
- Landed cost estimatorTotal delivered cost: freight, insurance, duties and fees.
- China credit code validatorCheck the 18-character code of a Chinese supplier.
- Master carton calculatorFrom units to cartons, CBM, weight and MOQ.
- Margin and markup calculatorSelling price by margin on price or markup on cost.
- Import documentsWhat to ask for by transport, product and payment.
- Before you pay your supplierBank account, deposit, balance and warning signs.
- Import timeline plannerOrder, production, shipment and arrival with Chinese holidays.
The schedule is for guidance. Your contract or proforma terms and the dates confirmed by your supplier, bank and carrier prevail.